The District has sub-divided the West Kill stream into a series of designated reaches. Each reach was delineated strictly based on known landmarks which would be familiar to the residents of the watershed. The limits of each project reach are not associated with either the stream classification or the identification of unstable reaches.  Stream reaches start at the bottom of the West Kill watershed , at the confluence with the Schoharie Creek, and extend up the stream. The stream system has also been divided into the Lower Watershed, Schoharie Creek to NYS 42 Bridge at West Kill (L-01 through L-02) and the Upper watershed, NYS 42 Bridge at West Kill to the headwaters (U-01 through U-04).

Guess What We Found

5,877 linear feet (1.1 miles) of eroded streambank
10,880.3 linear feet (2.1 miles) of existing Rock Riprap

495.7 feet of log cribbing which could be identified.

In the following section, you will find a brief summary of the District's preliminary findings regarding the state of the West Kill.  These reach summaries are based on observations of stream features, as well as information regarding past flood events and stream projects.  The District has become very familiar with the West Kill due to its many problems over the past 12 years. We have conducted numerous site visits, provided assistance to Greene County Highway Dept. in regards to stream problems, and conducted a number of stream walkovers.

All Level I Assessments Must Be Validated With
Field Measurements and Data Collection In Spring 2001

Project Reach L-01: 

          Reach Description: Schoharie Creek to Rt. 42 Bridge at Beech Ridge Road

          Level I Stream Types: B,C,F              Reach Length:   6,792 linear feet

Click Here for Level I Assessment Mapping of this Reach



Project Reach L-02: 

          Reach Description:  Rt. 42 Bridge at Beech Ridge Road to Rt. 42 Bridge near intersection of CR 6

         
Level I Stream Types: B,C,F              Reach Length:   8,852 linear feet

Click Here for Level I Assessment Mapping of this Reach



Project  Reach U-01: 

          Reach Description:   Rt. 42 near intersection with CR 6 to CR 6 Bridge at Shoemaker Rd.

         
Level I Stream Types:  B,F                 Reach Length:  10,856 linear feet

Click Here for Level I Assessment Mapping of this Reach



Project  Reach U-02:

         
Reach Description: CR 6 Bridge at Shoemaker Rd. to CR 6 Bridge at Evergreen Rd.

         
Level I Stream Types:  B,C                 Reach Length:  9,770 linear feet

Click Here for Level I Assessment Mapping of this Reach



Project  Reach U-03: 

       
Reach Description: CR 6 Bridge at Evergreen Rd. to CR 6 Bridge at AdVan Rd.

         
Level I Stream Types:  B,C,F               Reach Length:  9,350 linear feet   

Click Here for Level I Assessment Mapping of this Reach



Project Reach U-04: 

          Reach Description:  CR 6 Bridge at AdVan Rd. to Headwaters

          Level I Stream Types:  A,B,C,D            Reach Length:  9,495 linear feet

Click Here for Level I Assessment Mapping of this Reach




West Kill
Project Directory

Stream Classification Map

Stream Stability Flood Mitigation Projects

West Kill Photo
Project Partnerships & Funding

Stream Corridor Planning

West Kill Stream Project Home Page

Stream Restoration Program Home Page

GCSWCD Home Page